§ 13.04.150. Disconnection—Deposit—Operation.  


Latest version.
  • Temporary service will be furnished in conformity with the general regulations applicable and as additionally specified in this section:

    A.

    Temporary service connections shall be disconnected and terminated within six months after installation unless an extension of time is granted in writing by the water department;

    B.

    The applicant shall deposit, in advance, the estimated cost of installing and removing the facilities required to furnish said service. See Master Fee Schedule. Upon discontinuance of service the actual cost shall be determined and an adjustment made as an additional charge, refund or credit;

    C.

    All facilities for temporary services to the customer connection shall be made by the water department and shall be operated in accordance with its instructions.

(Ord. 225 § 58, 1982; Ord. 13 § 1 (part), 1965: prior code § 9115)